Stokes Sounds Off: Changes Noted to Estimates of Future Dedications and Rededications

Search This Blog

Leaderboard

Sunday, September 17, 2017

Changes Noted to Estimates of Future Dedications and Rededications

Hello, everyone! Hope you are all well and are having an inspirational and restful Sabbath Day. I am posting today with the latest copy of my temple construction progress report. While not a lot of progress has been noted on temples generally since I last posted this a couple of days ago, there have been some significant developments with one or two of them that are worthy of note. Additionally, after feeling impressed and inspired to look back at some things on previous reports, I have been able to make some adjustments to the estimates I am providing for future dedications and rededications.

This has been done primarily by figuring out when each of these temples first had the developments reported that have still not changed. If a temple has been in a similar or identical status for several months, I have felt impressed to make adjustments (whether slight or major) to my estimates for the completion time-frame listed. I am excited to share these changes with you. I can honestly say that this is the most thorough job I have ever done on researching how the current status of each temple may be indicative of how soon a completion could be expected.

As always, I would like to publicly acknowledge that I am far from perfect, and as such, there may be factors and elements in all of this that I am overlooking. That is my primary motivator behind posting these reports. Often, I will get a question or comment from someone that will change my understanding & perspective as those relate to these estimates. So, to any of you who have a suggestion, comment, question, or any other feedback for me, please let me know.

The only way I have been able to be successful in tracking these developments is by relying on what I find from my own study and from what I hear from those of you who continue to comment on these reports. I value your feedback immensely.

Here is the updated report. Enjoy, and let me know your thoughts. Thank you for the privilege of your time, and until my next post, may the Lord be with each and every one of you.

Temple Construction Progress (current as of 9/17/17)

NOTE ABOUT FUTURE TEMPLE CONSTRUCTION: As referenced in previous versions of this report, Elder Larry Y. Wilson, the Temple Department Executive Director, stated in an interview given as the open house for the newly renovated Idaho Falls Idaho Temple got underway that the Church currently has around 80 sites under consideration for a subsequent announcement within the next 15 years. While some, if not at least a majority, of those 80 sites will make it to a subsequent announcement, it is significant to think about. That would put the number of temples in any phase at around 260 or so in 2032. It is not hard to believe, therefore, that whether or not the Church makes an official goal to do so, we could see a minimum of 200 operating temples by or before the bicentennial (200th ) anniversary of the restoration of the Church (which will take place on Saturday April 6, 2030. With the Church only having to announce 18 additional temples and to complete the other 25 in any phase, all it would take to reach that milestone is for 3-4 temples being dedicated in each one of the 12.55 years between now and then, which works out to 3 or 4 temples that will need to be dedicated each year. Since the Church will be maintaining at least that average amount for the next 3 years at minimum, it appears to be very doable. For my part, I will be keeping my eyes open for any developments and will pass such news along as I hear of it.

CURRENT TEMPLE STATUS: The Church has 182 temples in various phases. There are 157 operating temples, with 1 that has had construction conclude (and is preparing for its open house) and 1 more that has construction wrapping up prior to its already scheduled dedication later this year. There are additionally 9 others are in various phases of construction and 1 more that had a groundbreaking last year, (with full-scale construction anticipated to begin within the first six months of next year). 1 other has a groundbreaking scheduled (which will take place in just over a month’s time. Of the temples that have been, are now, and will shortly be undergoing renovations, we have 1 that has a rededication scheduled (for the middle of next year), while 1 other is undergoing renovation (with completion anticipated sometime in either late summer or early fall next year), and another 4 have had their closure dates set before the end of this year, in addition to 5 others that we know will be closing early next year (with closure dates having been announced for all but one). The remaining 12 are announced (with either a site announcement or groundbreaking pending).

Construction completed, preparing for open house:
158. Meridian Idaho Temple: Practices for youth cultural celebration underway; open house reservations will start being accepted beginning Monday September 25, 2017, and will be available for the three week period spanning Saturday October 21 and Saturday November 11, excluding Sundays; dedication scheduled for Sunday November 19, 2017.

Construction nearing completion; dedication scheduled:
159. Cedar City Utah Temple: Finish work underway on interior; cultural celebration kick-off meeting held; open house reservations will start being accepted beginning Monday October 2, 2017, and will be available for the duration of the open house, which is set to run for 22 days (roughly 3.15 weeks) between Friday October 27 and Saturday November 18, excluding Sundays; dedication scheduled for Sunday December 10, 2017.
NOTE: With the open house set to begin in roughly 1.41 months, it seems apparent that construction is concluding. How close that is to actually being the case remains to be seen. But if the finish work on the interior is the last thing that needs to be completed, then the construction could be concluded by this time next week. As with everything else, I will pass along any updates as I learn of them.

Under Construction (completion anticipated by the end of next year (2018)):
160. Rome Italy Temple: Interior and exterior work progressing; construction office trailers donated to community organizations; office space relocated to patron housing; completion anticipated sometime during mid-2018.
NOTE: In studying this temple’s progress from the last little while, the last time any update was provided on this temple’s status was July 26, when the information about the construction office trailer donation and office space relocation to patron housing was added. The first time I mentioned that on this report was four days later. Looking back further on this temple’s status changes, I first added the information about the interior and exterior work progressing on May 30, about 3.5 months ago. While the other progress noted aside from this is significant, I wanted to put that development into perspective. I still feel safe in asserting that this temple will be the first new one dedicated next year, and I am making a revised estimate for that dedication for June 3 or 10. I did want to note that I have been advised that a dedication announcement for this temple is likely to happen in the near future. With Rome being such an iconic Christian city, I imagine the open house for it could last a good 4-6 weeks or so. It would not surprise me to have an announcement of those opening dates prior to the end of the year, and I will pass that information along as soon as I become aware of it.
161. Concepcion Chile Temple: Cladding progressing on east side of temple; west side nearly finished; hanging doors and installing millwork inside; completion anticipated sometime during mid-to-late 2018.
NOTE: While I previously stated that I felt this temple’s dedication could take place on August 19, we have not seen any progress on this temple since I last reported developments on it on August 31 of this year. Because there has not been any change in the 2.5 weeks since then, I am adjusting that estimate to September 2 or 9, especially since it feels that this temple may need another year to finish its construction. If this temple makes notable progress by the end of the year, I will be happy to adjust this again. For now, though, it seems wiser to be conservative in these estimates.
162. Kinshasa Democratic Republic of the Congo Temple: Royal palm trees planted on grounds; steel framing installed for steeple base; completion anticipated sometime during mid-to-late 2018.
NOTE: In my ongoing research regarding temple-related news and developments, I learned in regards to this temple that the biggest delays to this temple’s progress were trouble securing the needed steel reinforcement for the roof, the components of the steeple base, and the necessary landscaping items. Now that those issues have been resolved, this temple may progress faster than any, myself included, may be expecting. However, I still feel that the dedication of this temple is at least a year out. Therefore, I offer Sunday October 21 or 28 as a revised estimate for this temple’s dedication. Within the next 9 months, it will become more clear how reasonable that might be, and I will pass updates along as I make them going forward.
163.  Barranquilla Colombia Temple: Pouring concrete curbing and walkways; preparing to clad tower; completion anticipated sometime during late 2018.
NOTE: It is becoming increasingly more likely that this temple may take longer to complete than I originally thought. The status of this temple has not changed at all since I first reported the above developments for the first time (which was on August 11). Given that over a month (36 days) have passed with no change on this temple, I am adjusting my estimate for this dedication to take place either on Sunday November 18 (the Sunday before Thanksgiving) or, if not then, then 3 weeks later on Sunday December 9 (as the Church has not, to my knowledge, held any temple dedication the Sunday after Thanksgiving or on the first Sunday of December, when the First Presidency holds their annual Christmas devotional). If, by some miracle, this temple makes any kind of progress before the end of this year, or makes substantial progress within the first 8 months of next year, I could see a need to push that estimate up. For now, though, I have felt it wiser to be more conservative in this regard.

Under construction, completion anticipated during 2019:  
164. Durban South Africa Temple: Temple roof slab poured; brickwork continues at missionary housing; waterproofing and backfilling entrance buildings; completion anticipated sometime during early 2019.
NOTE: This temple, once thought to be a great candidate for dedication during mid-to-late 2018, may not be completed until 2019. I therefore pushed my estimate for this dedication to mid-March 2019. In looking back on it, the last update on this temple’s status was 2.5 weeks ago, on August 29. That said, the status of the Barranquilla Colombia Temple has not been updated in twice as long. So, if this temple does have more status changes than that one, I could see the merits of switching the two in terms of their future dedication time-frames. As always, I am keeping my eye out for information on all of this and will pass updates along as I learn of them.
165. Fortaleza Brazil Temple: Applying waterproofing membrane to temple exterior walls; meetinghouse exterior walls rising; completion anticipated sometime during early-to-mid 2019.
NOTE: With the exception of the additional information provided on this temple on August 30, there has been no significant change noted on the status of this temple since August 13. In view of that, I am changing my estimate to sometime during early-to-mid June.
166. Rio de Janeiro Brazil Temple: Crews preparing to pour exterior walls; completion anticipated sometime during mid-2019.
NOTE: As noted in recent days, many of the temples closing for renovation within the next 6-8 months will have their renovations completed within a 15-18 month window of their closure. Because the extent of those renovations has yet to be detailed, until more is known, I am proceeding on the assumption that many of those temples will have their rededication within the first half of 2019. Because of that, this temple’s dedication could take place at some point during late August or early September.
167. Lisbon Portugal Temple: Structural framing for main floor underway; meetinghouse cladding progressing; completion anticipated sometime during mid-to-late 2019.
NOTE: In view of other adjustments I have made to completion estimates (particularly those newer currently operating ones that are scheduled to close for renovation within the next five months and reopen at varying periods in 2019), and in view of the fact that this temple will likely be the last new one dedicated in 2019, I wanted to note that, depending on what happens with this temple’s progress over the next 9 months, there may be a case for altering the estimate I have previously given for its dedication. For now, I am suggesting Sunday November 10 or 17, but if I see a reason to alter that date, I will do so.

Temples anticipated to be completed sometime during 2020:
168. Arequipa Peru Temple: Setting rebar for second floor structural walls; completion anticipated sometime during early 2020.
NOTE: While my study has verified that this temple’s dedication is more likely to occur in the early months of 2020 than prior to the end of 2019, what is not as clear is how quickly during early 2020 that dedication might occur. Until more is known, I am venturing an estimate of late February or early March, which would allow this dedication to take place during the Peruvian fall season.

Construction pending:
169. Winnipeg Manitoba Temple: Groundbreaking held Saturday December 3, 2016; plans being slightly modified; full-scale operations anticipated to begin in the first or second quarter of 2018; completion anticipated sometime between early-to-mid 2020.
NOTE: If, as anticipated, full scale construction is able to get underway on this temple prior to the end of June 30, and if, as estimated, the time-frame for this temple’s construction remains around 20 months (1.67 years), then, all going well, this temple could easily be dedicated in late April or early May. If further delays occur, or if, for any reason, the estimate changes for this temple’s construction time-frame, then that will obviously warrant a change in the completion estimate. Until we know for sure, however, I remain optimistic.

Groundbreaking scheduled:
170. Port-au-Prince Haiti Temple: Ground being cleared; preparing for groundbreaking ceremony, which is scheduled for Saturday October 28, 2017; completion anticipated sometime during mid-to-late 2020.
NOTE: As previously noted, the first Caribbean temple (the Santo Domingo Dominican Republic) took 4 years and 1 month to progress from groundbreaking to dedication. Given that this temple is considerably smaller, I have felt that an initial estimate of 2 years and 7 months is a good initial way to gauge a completion estimate. Of course, whether or not that happens depends on two main things: whether or not full-scale construction is able to begin on this temple within a week after its’ groundbreaking, and whatever conditions might help or hinder its swift construction. Until more is known, I want to be as conservative as I possibly can, so I am estimating this temple’s dedication may take place in mid-August. As always, I will pass along any updates to this estimate as they are made.

Scheduled for rededication:
20. Jordan River Utah Temple: Closed for renovation; rededication scheduled for Sunday May 20, 2018.

Undergoing Renovation (rededication anticipated within the next year or so):
41. Frankfurt Germany Temple: Closed for renovation; roof slab poured for basement addition; rededication anticipated sometime during mid-2018.
NOTE:  As I have previously noted, this temple will likely be dedicated sometime after both the rededication of the Jordan River Temple and the dedication of the Rome Italy Temple, but prior to the dedication of the Concepcion Chile Temple. Until more is known, I am setting that estimate for Sunday August 12 or 19, which is slightly later than I have previously estimated. As with everything else, I will be sure to post any updates to this estimate as I make them going forward.

Renovations Scheduled (official closure dates announced):
80. Memphis Tennessee Temple: Scheduled to close for renovation on Saturday September 30, 2017; rededication may take place sometime during early-to-mid 2019.
NOTE: With this temple’s renovation closure date confirmed by the Church’s redone website for temple information, and with the knowledge that this renovation will change the interior and exterior appearance of this temple, an estimate of 18-19 months seems appropriate for this temple’s renovation process, which would put its dedication sometime during mid-to-late May 2019. As this process gets underway and continues, I will make any additional adjustments that may be needed.
18. Tokyo Japan Temple: Scheduled to close for renovation on Monday October 2, 2017; rededication may take place sometime during early-to-mid 2020.
NOTE:
95. Oklahoma City Oklahoma Temple: Scheduled to close for renovation on Sunday October 15, 2017; rededication may take place sometime during early-to-mid 2019.
NOTE: While it is true that this temple has more room for expansion than Memphis does, it does not seemly likely that such an expansion is part of the plan. Therefore, a revised estimate of 15 months seems likely for the completion of that renovation process. Based on that time-frame, I am also estimating a subsequent rededication during mid-March 2019. As that process unfolds, I will pass along any changes to that line of reasoning.
112. Asuncion Paraguay Temple: Scheduled to close for renovation on Sunday October 29, 2017; rededication may take place sometime during early-to-mid 2019.
NOTE: The interesting thing about this temple’s renovation plans is that any mention of it closing on the date specified (or even at all in 2017) has been removed. Probably just a technical glitch. In the meantime, unless an expansion of this temple is planned (which is unlikely at this point), a 15-month estimate seems reasonable for this temple’s completion, which would put the dedication sometime during mid-March 2019. That will likely change as this process continues, but for now, it seems safe.
68. Raleigh North Carolina Temple: Scheduled to close for renovation on Wednesday January 10, 2018; rededication may take place sometime during mid-2019.
NOTE: If the member contacts I found in North Carolina are correct, the renovation of that state’s only temple will not involve or include an expansion of any kind. With that in mind, a 17-month estimate seems appropriate for this temple, which allows for anything unexpected. And based on that estimate, it would make sense if this temple had a rededication scheduled for sometime during early-to-mid August 2019. I will pass along any updates to that estimate that may be needed within the next year as this process will be well underway by that time.
94. Baton Rouge Louisiana Temple: Scheduled to close for renovation on Thursday February 1, 2018; rededication may take place sometime during mid-to-late 2019.
NOTE: Unless an expansion is planned for this temple (which, as noted previously, seems doubtful), then it is more than likely that the renovation will only take around 17 months or so. With that in mind, it is not hard to believe that we could see the rededication of this temple at some point during mid-September 2019. As with everything else, I will be sure to pass along any updates to this line of reasoning.
13. Oakland California Temple: Scheduled to close for renovation on Monday February 19, 2018; rededication may take place sometime during mid-to-late 2019.
NOTE: 16. Washington D. C. Temple: Scheduled to close for renovation on Sunday March 4, 2018; rededication may take place sometime during mid-to-late 2020.
NOTE: With what is currently known about this temple’s renovation (having confirmed the exact date, and also knowing that it is mainly to upgrade and update the mechanical and electrical system), in taking the larger size of this temple into account (which will extend the process), a 32-month estimate seems appropriate. That would put this temple’s rededication sometime between late November and mid-December 2020. As the next year unfolds, more will be known, and any adjustments will be provided.

Temples which have had a renovation announced but for which an exact closure date is not yet known:
7. Mesa Arizona Temple: Scheduled to close for renovation in May 2018 (exact date has not yet been announced); rededication may take place sometime during mid-to-late 2020.
NOTE: Because the Mesa temple has been renovated once before, it is not anticipated to take as long to complete this renovation (which is being done primarily to upgrade the electrical and mechanical systems throughout the temple). Therefore, an initial estimate of 26 months seems appropriate, which would put the estimate for this temple’s rededication somewhere around early-to-mid September 2020. Within the next year, this process will be well underway, and more will be known about any adjustments that may need to be made. Until then, it seems to be a sound adjustment to what I have previously stated.

NOTE ON FUTURE GROUNDBREAKINGS: Until the prophet (or those he authorizes to do so in his behalf) announces a groundbreaking for any or all of these temples, the timeframes listed below reflect merely my own thoughts, theories, and conjectures, based on what is now known about how soon any of them might happen. I continue to hope and pray for news of other groundbreakings, but time will tell how imminent any of these events will be, and whether or not they will unfold as presented below. I am keeping an eye out for developments and will pass along any updates as I receive them, including any and all changes to these estimates. Until something more official comes out, this information should not be taken as gospel, as it will be consistently altered as developments change these estimates. And speaking personally, I will be just as happy if I am proven wrong on any of this as I will be if anything in this section is proven right. For me, the privilege has always been the opportunity to contribute to discussions in this regard.

Announced temples that may have a groundbrea/king sometime within the next year (whether or not they happen in this order):
171. Lima Peru Los Olivos Temple: Planning and preliminary construction phase; awaiting official site announcement; groundbreaking could take place sometime during early-to-mid 2018.
NOTE: If the information I have received about this temple and its progress is correct, the year of preconstruction which the contractor for this temple mentioned was needed prior to its groundbreaking began in March 2017. If that is verified at any point within the next few months, it is not hard to believe that a groundbreaking could follow in early-to-mid March of next year, if not sooner. That said, I could also see the Church identifying a site and having a groundbreaking for this temple sometime after one is held for the Urdaneta Philippines Temple, which is currently the oldest among those announced that have not progressed beyond that point. More to come once more is known.
172. Urdaneta Philippines Temple: Planning and approval phase; awaiting government approval and official site announcement; groundbreaking could take place sometime during mid-2018.
NOTE: While a specific site has not yet officially been confirmed for this this temple, a look on September 4, 2017 at some information for this temple shows some site pictures. If a likely site has been identified but not publicly announced, then that opens up the possibility that this temple could potentially have a groundbreaking sooner than many (myself included) have previously thought, either before the end of this year or in short order after next year begins. While I won’t change the listed order for these announced temples yet, I did want to note that this one and that one may be interchangeable, especially since there are site photographs for this one, while we are still waiting for a site confirmation for that one. As always, I will pass along any changes to this line of thought as I make it.
173. Harare Zimbabwe Temple: Planning phase; awaiting official site announcement; groundbreaking could take place during mid-to-late 2018.
NOTE: Despite the statement made by Africa Southeast Area President Elder Kevin S. Hamilton (who stated when this year began that a site announcement and groundbreaking would happen for this temple in short order), with 2017 being more than 2/3 over, it is getting increasingly less likely that we will see anything happen for this temple prior to the end of this year. As differing reports have necessitated doing so, I have moved this temple down and up again repeatedly. But it now appears certain that this temple will be one of those that will have a site announcement and groundbreaking during 2018, if not before. And as I have considered my own thoughts on this, I have felt that might happen at some point during early-to-mid August. As the time between now and then passes, that may change, and I will pass that along as I am able to.

Announced temples that may have a groundbreaking anytime between September 2018 and the end of 2019:
174. Saratoga Springs Utah: Planning phase; awaiting official site announcement; groundbreaking may take place sometime during mid-to-late 2018.
NOTE: After running the numbers to find out how long it has taken, on average, for other Utah County temples to go from announcement to groundbreaking, I have felt it wise to change my estimate to early-to-mid September. Obviously, if we do not hear of a site announcement for this temple within the next 9 months or so, that will need to be pushed back. But until more is known, it seems sound.
175. Brasilia Brazil Temple: Planning phase; site inspected by Church engineers on June 21, 2017; groundbreaking may take place sometime during late 2018.
NOTE: While I once believed and asserted that this temple would have a groundbreaking in fairly short order once 2018 began, especially since as site had been confirmed and inspected, in the interim, I have discovered that there is merit in believing that other temples that were announced earlier than this one, although the temple above this one is an exception to that notion. Until more is known, I have felt that a preliminary estimate of late October or early November 2018. As more is known, I will make any adjustments that may be necessary.
176. Alabang Manila Temple: Planning phase; site confirmed; awaiting official name announcement; groundbreaking may take place sometime during late 2018.
NOTE: As previously noted, the name above is my own speculation, and is subject to change based on whenever anything more official may be announced at Church headquarters, which I think will happen sooner rather than later. I will be just as happy if I find I am wrong on this temple’s name as I would be if I am right. Either way, since a site has been confirmed, I am predicting that a groundbreaking could follow sometime during mid-December 2018. As always, I will continue to pass along any changes to this estimate, and will also pass along the official name for this temple whenever it is announced.
177. Pocatello Idaho: Planning phase; awaiting site confirmation; groundbreaking may take place sometime during early 2019.
NOTE: Even though this temple is in the “Mormon corridor”, where temples have been known to go up very quickly, for this temple’s groundbreaking estimate, I looked at the average time-frame within which other Idaho temples have gone from announcement to groundbreaking. And in that regard, I have become convinced that this temple’s groundbreaking could take place in early-to-mid March 2019. I will be sure to post any updates to this theory as I find out more. It will also be easier to estimate once an official site is confirmed. The most likely site (in my opinion) has been annexed into the city of Pocatello, but until it is confirmed or denied that the temple will be built there, it is best to be conservative in this estimate.
178. Nairobi Kenya Temple: Planning phase; awaiting official site announcement; media event held June 14, 2017; groundbreaking may take place sometime during mid-2019.
NOTE: As previously noted, Elder Sitati stated during the media event for this temple that the Church generally takes one to two years from a temple’s announcement to have a groundbreaking. In that regard, the general time-frame above seems wise. As to a more specific estimate, I could see it happening in early-to-mid May. As more information comes in about this temple, I will make any needed adjustments.
179. Bangkok Thailand Temple: Planning phase; awaiting official site announcement; groundbreaking may take place during mid-2019.
NOTE: If the Church verifies member speculation (that an existing Church office building will be rebuilt, renovated, and repurposed into a multi-purpose Church office, meetinghouse, and temple) at any point in the next year or so, a groundbreaking could easily happen during this time. Until more is known, an estimate of early-to-mid June seems sound. I will pass along any information that changes that.
180. Abidjan Ivory Coast Temple: Planning phase; awaiting official site announcement; groundbreaking may take place sometime during mid-to-late 2019.
NOTE: While an official site announcement is still pending, we do know that the Church is thriving in the Ivory Coast to such an extent that many are saying that nation may get a second and possibly even a third temple within the next 15-30 years. We will have to see how accurate that is. In the meantime, for this temple, the timing of a future groundbreaking will largely depend on how soon we hear about a potential site location. Wanting to be as conservative as I can, I will say that I could see this groundbreaking potentially happening in early-to-mid August. Until more is known, that is a change from what I have previously posted. As with everything else, I will pass along any updates.
181. Quito Ecuador Temple: Planning phase; awaiting official site announcement; groundbreaking may take place during late 2019.
NOTE: While the Ecuadoran Saints had to wait 14 long years between the announcement and groundbreaking for the first temple in that nation, this temple is not anticipated to have nearly as long of a wait. If a site is announced for this temple within the next year, a groundbreaking could happen sooner than anticipated herein. Until more is known, I have felt an estimate of early-to-mid September would be safe for this groundbreaking. I will be sure to pass along any updates to this estimate.
182. Belem Brazil Temple: Planning phase; awaiting official site announcement; groundbreaking may take place during late 2019.
NOTE: While I would hope with all my heart that this temple will not be the last of the current lot to have a groundbreaking, until more is known, I have felt it wiser to be conservative in my estimates for when it will occur. It is almost certain, however, that the Brasilia Brazil temple, which has already had a site confirmed, will have a groundbreaking before this one, even though that one was announced a year later. Wanting to be as conservative as I can, I will say that I think we could see this temple’s groundbreaking in late October or early November. As the next year passes, I will pass along any adjustments to this line of thinking.

ADDITIONAL GENERAL NOTE: As noted above, Elder Larry Y. Wilson stated in an interview on the last day of April 2017 (as the Idaho Falls Temple Open House was underway) that the Church has 80 potential sites that are under consideration for an official announcement within the next 15 years. As previously noted, all of the last 12 temples that have been announced from January 2015 to now have seen that happen during April General Conference. So that may continue. But it is also true that such announcements can come any time the Church president or those authorized to do so in his behalf feel impressed to make them. Since 80 temples in 15 years averages out to 5 new announcements per year between now and sometime in 2032, we could be entering an era where a few are announced in each conference and when some will be announced in between each April and October. Future versions of this report will feature any and all ongoing developments in this regard. Stay tuned for that, and thank you for the privilege of your time.

Key:
Bolded numbers and text denote temples whose numbers already exists (for renovations), or is certain due to a scheduled dedication, as well as information that is certain, such as dedication or groundbreaking dates.
Italicized numbers and text denote temples whose numbers may change based on the order in which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote temples whose numbers may change based on progress towards planning, approval, and groundbreaking.

Red text highlights changes from the last posted temple progress report.

No comments:

Post a Comment

In addition to my life-long love for the subjects which I cover in the posts of this blog, I have long held the belief that we can disagree without becoming disagreeable. Differences of opinion are natural, while being disagreeable in expressing those differences is not. And in that sense, I have no desire to close the door on anyone who earnestly desires to contribute to the ongoing dialogue on subjects covered in the posts on this blog.

At the same time, however, I recognize that we live in a time when incivility, discourtesy, unkindness, and even cyber-bullying has regrettably become part of online interactions. With that in mind, while anyone who wishes can comment on anything if they choose to do so, I hereby reserve the right to immediately delete any comments which are critical, unkind, lack civility, or promote prodcuts, services, and values contrary to either the Church, or to the rules of online etiquette.

I'd also like to remind all who comment here that I try to respond personally to each individual comment as I feel is appropriate. Such replies are not meant to end the conversation, but to acknowledge earnest feedback as it is submitted.

And in order to better preserve the spirit and pure intentions for which this blog was established, I also hereby request that anyone not commenting with a regular user name (particularly those whose comments appear under the "Unknown" or "Anonymous" monikers, give the rest of us a name to work with in addressing any replies. If such individuals do not wish to disclose their actual given names, a pseudonym or nickname would suffice.

Any comments made by individuals who opt to not give a name by which they can ber identified may, depending on the substance and tone of such comments, be subject to deletion as well. I would respectfully ask that all of us do all we can to keep the dialogue positive, polite, and without malice or ill-will. May the Lord bless us all in our discussion of these important matters.