Stokes Sounds Off: 09/27/16

Search This Blog

Leaderboard

Tuesday, September 27, 2016

Transcripts available for the General Women's Session

As per the usual timetable, the Church today has published transcripts of the talks given during the General Women's Session on Saturday. Click here to read those talks. Enjoy!

Yet another temple construction progress report

Here is yet another temple construction progress report. As always, the changes from the last posted report are highlighted in red. Please let me know what you think.

Temple Construction Progress Report (current as of 9/27/16)
Current Temple Status: 152 operating; scheduled for dedication; 11 under construction; 3 undergoing renovation; 11 announced (As many as 3 groundbreaking announcements may be made soon).

Dedication scheduled:
153. Fort Collins Colorado Temple: Preparing for dedication, scheduled on Sunday October 16, 2016.
154. Star Valley Wyoming Temple: Public open house tours underway through Saturday October 8; dedication scheduled on Sunday October 30, 2016.
155. Hartford Connecticut Temple: Accepting reservations for public open house scheduled September 30-October 22; dedication scheduled on Sunday November 20, 2016.

Under Construction:
156. Paris France Temple: Stained glass installation underway; entrance landscaping progressing; completion anticipated sometime during the first half of 2017.
157. Meridian Idaho Temple: Concrete slab in place for monument sign; planting trees and bushes; completion anticipated sometime in late 2017.
158. Cedar City Utah Temple: Angel Moroni placed on September 15, 2016; completion anticipated sometime in late 2017.
159. Tucson Arizona Temple: Pouring concrete parking lot; interior work underway; completion anticipated sometime in late 2017.
160. Rome Italy Temple: Interior work underway including some material replacement and rework; completion anticipated sometime in the first half of 2018.
161. Concepcion Chile Temple: Pouring parapet and tower walls; completion anticipated sometime in 2018.
162. Kinshasa Democratic Republic of the Congo Temple: Foundation poured and backfilled; pouring interior footings; completion anticipated sometime in 2018.
163. Durban South Africa Temple: Excavation for foundation underway; preparing the parking area; completion anticipated sometime in 2018.
164. Barranquilla Colombia Temple: Foundation walls going up; completion anticipated sometime in 2019.
165.  Fortaleza Brazil Temple: Forms and rebar set in anticipation of pouring foundation walls; completion anticipated sometime in 2019.
166. Lisbon Portugal Temple: Site clearing underway; completion anticipated sometime in 2019.

Undergoing Renovation:
8. Idaho Falls Idaho Temple: Closed for renovation; finish work underway; resurfacing and restriping parking lot; rededication anticipated sometime during early 2017.
20. Jordan River Utah Temple: Closed for renovation; rededication anticipated sometime in late 2017.
41. Frankfurt Germany Temple: Closed for renovation; rededication anticipated sometime in 2018.

Announced:
167. Arequipa Peru Temple: No groundbreaking date set, however, construction is pending, and, according to the contractor for the project, that construction anticipated to begin sometime during late 2016.
168. Winnipeg Manitoba Temple: Permitting phase; temple fireside held September 11, 2016; groundbreaking anticipated in either late 2016 or early 2017.
169. Rio de Janeiro Brazil Temple: No groundbreaking set. However, construction anticipated to begin in either late 2016 or early 2017.
170. Urdaneta Philippines Temple: Planning and approval phase; awaiting official site announcement.
171. Port-au-Prince Haiti Temple: Planning and approval phase; awaiting official site announcement.
172. Bangkok Thailand Temple: Planning and approval phase; awaiting official site announcement.
173. Abidjan Ivory Coast Temple: Planning phase; awaiting official site announcement.
174. Quito Ecuador Temple: Planning phase; awaiting official site announcement.
175. Harare Zimbabwe Temple: Planning phase; awaiting official site announcement.
176. Belem Brazil Temple: Planning phase; awaiting official site announcement.
177. Lima Peru Los Olivos Temple: Planning phase; awaiting official site announcement.

Key:
Bolded numbers and text denote temples whose numbers already exists (for renovations), or is certain due to a scheduled dedication, as well as information that is certain, such as dedication or groundbreaking dates.
Italicized numbers and text denote temples whose numbers may change based on the order in which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote temples whose numbers may change based on progress towards planning, approval, and groundbreaking.
Red text denotes changes from the last posted temple progress update.