Temple Construction Progress Update

Hello, all! Just posting with some exciting developments on the temple news front. In addition to what has already been noted in the last few updates on the Cedar City Utah temple, that temple is also having window frames and art glass put in. Additionally, due to new information from Rick Satterfield, it appears that the Arequipa Peru temple has been downgraded to a groundbreaking pending status, rather than specifying a date. In the meantime, the Winnepeg temple remains the one and only temple with a groundbreaking date estimated.

Temple Construction Progress Report (current as of 11/2/16)
Current Temple Status: 154 operating; 1 scheduled for dedication; 11 under construction; 3 undergoing renovation; 11 announced (As many as 3 groundbreaking announcements may be made soon).

Dedication scheduled:
155. Hartford Connecticut Temple: Preparing for dedication; dedication scheduled on Sunday November 20, 2016.

Under Construction:
156. Paris France Temple: Interior work underway; open house committee assembled; completion anticipated sometime during the first half of 2017.
157. Meridian Idaho Temple: Adding landscaping structures; installing fence posts and lamp posts; completion anticipated sometime in late 2017.
158. Cedar City Utah Temple: Installing sprinkler systems and planting bushes; installing window frames and art glass; completion anticipated sometime in late 2017.
159. Tucson Arizona Temple: Pouring concrete parking lot; adding landscaping structures; completion anticipated sometime in late 2017.
160. Rome Italy Temple: Interior work progressing; completion anticipated sometime in the first half of 2018.
161. Concepcion Chile Temple: Steeple framework going up; completion anticipated sometime in 2018.
162. Kinshasa Democratic Republic of the Congo Temple: Main level floors poured; completion anticipated sometime in 2018.
163. Durban South Africa Temple: Preparing to pour foundation; laying aggregate for parking; street entrance cut; hydroseeding sloped land; completion anticipated sometime in 2018.
164. Barranquilla Colombia Temple: Foundation walls going up; completion anticipated sometime in 2019.
165.  Fortaleza Brazil Temple: Erecting structural framing; completion anticipated sometime in 2019.
166. Lisbon Portugal Temple: Site clearing phase; construction fence erected; concrete bleachers removed; completion anticipated sometime in 2019.

Undergoing Renovation:
8. Idaho Falls Idaho Temple: Closed for renovation; finish work underway; resurfacing and restriping parking lot; rededication anticipated sometime during the first half of 2017.
20. Jordan River Utah Temple: Closed for renovation; rededication anticipated sometime in late 2017.
41. Frankfurt Germany Temple: Closed for renovation; rededication anticipated sometime in 2018.

Announced:
167. Winnipeg Manitoba Temple: Permitting phase; temple fireside held September 11, 2016; groundbreaking anticipated in either late 2016 or early 2017.
168. Arequipa Peru Temple: General contractor selected; groundbreaking pending.
169. Rio de Janeiro Brazil Temple: Construction preparation phase; plans approved by local government; groundbreaking pending.
170. Urdaneta Philippines Temple: Planning and approval phase; awaiting official site announcement.
171. Port-au-Prince Haiti Temple: Planning and approval phase; awaiting official site announcement.
172. Bangkok Thailand Temple: Planning and approval phase; awaiting official site announcement.
173. Abidjan Ivory Coast Temple: Planning phase; awaiting official site announcement.
174. Quito Ecuador Temple: Planning phase; awaiting official site announcement.
175. Harare Zimbabwe Temple: Planning phase; awaiting official site announcement.
176. Belem Brazil Temple: Planning phase; awaiting official site announcement.
177. Lima Peru Los Olivos Temple: Planning phase; awaiting official site announcement.

Key:
Bolded numbers and text denote temples whose numbers already exists (for renovations), or is certain due to a scheduled dedication, as well as information that is certain, such as dedication or groundbreaking dates.
Italicized numbers and text denote temples whose numbers may change based on the order in which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote temples whose numbers may change based on progress towards planning, approval, and groundbreaking.
Red text denotes changes from the last posted temple progress update.