Temple Construction Progress Report
(current as of 11/15/16)
Current Temple Status: 154 operating; 2 scheduled
for dedication; 10 under construction; 1 scheduled for rededication; 2
undergoing renovation; 11 announced (With up to 3 that may soon have a groundbreaking
scheduled).
Dedication scheduled:
155. Hartford
Connecticut Temple: Preparing for dedication; dedication scheduled on Sunday
November 20, 2016.
156. Paris
France Temple: Interior work underway; open house and dedication dates
announced; scheduled to be dedicated on Sunday
May 21, 2017.
Under Construction:
157. Meridian Idaho
Temple: Adding landscaping structures; installing fence posts and lamp posts; completion
anticipated sometime in late 2017.
158. Cedar City Utah
Temple: Installing sprinkler
systems and planting bushes; installing window frames and art glass; completion
anticipated sometime in late 2017.
159. Tucson Arizona
Temple: Pouring concrete parking lot; adding landscaping structures; completion
anticipated sometime in late 2017.
160. Rome Italy Temple:
Interior work progressing; completion
anticipated sometime in the first
half of 2018.
161. Concepcion Chile
Temple: Steeple framework going up; completion anticipated sometime in 2018.
162. Kinshasa Democratic
Republic of the Congo Temple: Building the exterior walls; completion
anticipated sometime in 2018.
163.
Durban South Africa Temple: Foundation columns poured;
fencing the property; storm water system in place; landscaping entrance mounds;
completion anticipated sometime in 2018.
164. Barranquilla
Colombia Temple: Exterior walls rising; completion
anticipated sometime between 2018 and 2019.
165.
Fortaleza Brazil Temple: Erecting
structural framing; completion anticipated sometime in 2019.
166. Lisbon Portugal Temple:
Temple site cleared; preparing to pour meetinghouse
footings; completion anticipated sometime in 2019.
Scheduled for rededication:
8. Idaho Falls Idaho
Temple: Closed for renovation; finish work underway; rededication scheduled for
Sunday June 4, 2017.
Undergoing Renovation:
20. Jordan River Utah
Temple: Closed for renovation; rededication anticipated sometime in late
2017.
41. Frankfurt Germany
Temple: Closed for renovation; rededication anticipated sometime in 2018.
Announced:
167.
Winnipeg Manitoba Temple: Permitting phase; temple fireside held
September 11, 2016; groundbreaking anticipated in early 2017.
168. Arequipa Peru
Temple: General contractor selected; groundbreaking pending.
169. Rio de Janeiro
Brazil Temple: Construction preparation phase; plans approved by local
government; groundbreaking pending.
170. Urdaneta
Philippines Temple: Planning and approval phase; awaiting official site
announcement.
171. Port-au-Prince
Haiti Temple: Planning and approval phase; awaiting official site announcement.
172. Bangkok Thailand
Temple: Planning and approval phase; awaiting official site announcement.
173. Abidjan Ivory
Coast Temple: Planning phase; awaiting official site announcement.
174. Quito Ecuador
Temple: Planning phase; awaiting official site announcement.
175. Harare Zimbabwe
Temple: Planning phase; awaiting official site announcement.
176. Belem Brazil
Temple: Planning phase; awaiting official site announcement.
177. Lima Peru Los
Olivos Temple: Planning phase; awaiting official site announcement.
Key:
Bolded numbers and text denote
temples whose numbers already exists (for renovations), or is certain due to a
scheduled dedication, as well as information that is certain, such as dedication
or groundbreaking dates.
Italicized numbers and
text denote temples whose numbers may change based on the order in
which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote
temples whose numbers may change based on progress towards planning, approval,
and groundbreaking.
Red text denotes changes from
the last posted temple progress update.