Temple Construction Progress
(current as of 9/1/17)
NOTE ABOUT FUTURE TEMPLE CONSTRUCTION: As referenced in previous
versions of this report, Elder Larry Y. Wilson, the Temple Department Executive
Director, stated in an interview given as the open house for the newly renovated
Idaho Falls Idaho Temple got underway that the Church currently has around 80
sites under consideration for a subsequent announcement within the next 15
years. While some, if not at least a majority, of those 80 sites will make it
to a subsequent announcement, it is significant to think about. That would put
the number of temples in any phase at around 260 or so in 2032. It is not hard
to believe, therefore, that whether or not the Church makes an official goal to
do so, we could see a minimum of 200 operating temples by or before the
bicentennial (200th ) anniversary of the restoration of the Church
(which will take place on Saturday April 6, 2030. With the Church only having
to announce 18 additional temples and to complete the
other 25 in any phase, all it would take to reach that milestone is for 3-4
temples being dedicated in each one of the 12.59 years
between now and then, which works out to 3 or 4 temples that will need to be
dedicated each year. Since the Church will be maintaining at least that average
amount for the next 3 years at minimum, it seems very feasible. For my part, I
will be keeping my eyes open for any developments and will pass such news along
as I hear of it.
CURRENT TEMPLE STATUS: The Church has 182 temples in any phase.
There are 157 operating
temples, with 2 more that have
construction wrapping up prior to their already scheduled dedications later
this year. There are additionally 9 others are in various construction phases
and 1 more that had a
groundbreaking last year, with full-scale construction anticipated in the very
near future (hopefully before the end of this year). 1 other has a
groundbreaking scheduled (which will take place in just under 2 months. Of the
temples that have been, are now, and will shortly be undergoing renovations, we
have 1 that has a rededication scheduled (for the middle of next year), while 1
other is undergoing renovation (with completion anticipated sometime in either
late summer or early fall next year), and another 4 have had their closure
dates set before the end of this year, in addition to 5 others that we know
will be closing early next year (the actual dates for each of those will be set
closer to the time). The remaining 12
are announced (with either a site announcement or groundbreaking
pending).
Construction nearing completion; dedication scheduled:
158. Meridian
Idaho Temple: Finalizing landscaping and interior work; accepting open house reservations beginning Monday September 25, 2017 (and
will continue to be accepted during the open house, which is set to run tours from
Saturday October 21-Saturday November 11, excluding Sundays); dedication
scheduled for Sunday November 19, 2017.
159. Cedar
City Utah Temple: Hanging interior light fixtures; installing art glass; accepting
open house reservations beginning Monday October 2, 2017 (and will continue to be accepted during the open house,
which is set to run tours from Friday October 27-Saturday November 18,
excluding Sundays); dedication scheduled for Sunday December 10, 2017.
NOTE: As noted on the last version
of this report published on this blog, it appears that the work of landscaping
for the temple grounds has concluded, signifying that this temple is that much
closer to its dedication.
Under Construction (completion anticipated within the next 1-2 years):
160. Rome Italy Temple:
Interior and exterior work progressing; construction office trailers donated to
community organizations; office space relocated to patron housing; completion anticipated
sometime during mid-2018.
NOTE: In view of the plans
announced to rededicate the Jordan River Temple, and because this temple has
progressed more consistently than the Frankfurt Germany Temple, it is my
feeling that this temple will be dedicated at some point before the annual July
recess of the General Authorities. If I receive information that changes that
belief, I will be sure to pass it along.
161. Concepcion Chile
Temple: Cladding progressing on tower and east and west walls; decorative fence
installation underway; hanging doors and installing millwork inside; completion
anticipated sometime during mid-to-late
2018.
NOTE: This temple has moved up and
down on this list a great deal since its groundbreaking in mid-October 2015 by
Elder Walter F. Gonzalez. In the temple construction progress report I posted a while ago, this temple had been anticipated to be
the third temple dedicated this year. I was very much surprised and gratified
to find that this temple would likely be finished sooner than expected. Even so, I found out recently that, while it has made great
strides, it is more likely that this temple may be the first one dedicated
following the annual July recess of the General Authorities. Not much later
than I was anticipating, but I did want to note that.
162. Kinshasa
Democratic Republic of the Congo Temple: Roof decking attached; baptismal font
concrete to be repoured; searching for landscaping palm trees; completion
anticipated sometime during mid-to-late
2018.
NOTE: While
I fervently hope that this temple will be completed closer to the earlier side
of this estimate, information that I came across last night indicates the
completion of this temple will be closer to a year from now than earlier than that.
I am setting a preliminary estimate of mid-to-late September 2018.
163. Barranquilla
Colombia Temple: Pouring concrete curbing and walkways; preparing to clad
tower; completion anticipated sometime during late 2018.
NOTE: This
temple, once thought to be among the first completed in 2018, may now turn out
to be the last one dedicated in 2018, if current trends continue. In view of
additional information I received recently, I am setting a new estimate for
late October-early November 2018.
164. Durban South Africa
Temple: Temple roof slab poured; brickwork continues at missionary housing; waterproofing
and backfilling entrance buildings; completion anticipated sometime during late 2018-early 2019.
NOTE: As
promised in previous version of this report, I did some more research that
pointed to the notion that, barring anything unexpected, the completion of this
temple may take around 1.5 years rather than just the 1 that I thought. It is
therefore my new feeling that the dedication of this temple will be around late
February or early March 2019. If my thinking on that changes, I will pass that
along.
Under construction, completion
anticipated within the next 2-3 years:
165. Fortaleza Brazil
Temple: Applying waterproofing membrane to temple exterior walls; meetinghouse
exterior walls rising; completion anticipated sometime during early-to-mid 2019.
NOTE: As
part of my ongoing research, I studied when this temple might be completed. And
that study has led me to conclude that the completion of this temple will
likely happen in mid-to-late May 2019. If that changes, I will pass that along.
166. Rio de Janeiro Brazil Temple: Construction
underway on temple substructure; completion anticipated sometime during mid-2019.
NOTE: As
part of my efforts to reevaluate potential completion estimates, I discovered
that this temple is more likely to be dedicated following the annual July
recess of the General Authorities, perhaps by early-to-mid August. If my
thinking on that changes, I will pass that along.
167. Lisbon Portugal
Temple: Preparing to pour main floor slab of
temple; meetinghouse cladding progressing; completion anticipated sometime
during mid-to-late
2019.
NOTE: While
I hope I am wrong in this regard, my additional research on this temple points
to the notion that this temple may only be dedicated by late October or early
September of 2019. If my thinking on that changes, I will pass that along.
168.
Arequipa Peru Temple: Setting rebar for second floor structural walls; completion
anticipated sometime during late 2019.
NOTE: As
noted on other temples, I have done more research lately on when each temple
might be completed. Having received a common opinion that this temple may not
be completed until more towards early 2020, and having taken that into account,
I am still convinced that this temple may be the last temple completed in 2019,
and that that dedication may happen in mid-December 2019. As always, once this
temple makes more progress, I will be sure to pass along any changes to that
thinking.
Construction pending:
169.
Winnipeg Manitoba Temple: Groundbreaking held Saturday December 3, 2016; awaiting
full-scale operations; acquiring building permits; completion anticipated
sometime between late 2019-early 2020.
NOTE: As
previously noted on earlier versions of this report, until full-scale
construction begins on this temple, an exact completion time-frame may be hard
to pin down. Even so, I ran the numbers, and with the 20 months (1.67 years) of
construction that are anticipated for this temple, as long as construction gets
underway by July or August of 2018, then the completion of this temple could
indeed easily happen by early 2020. Until more is known, that is an adjustment
from what I had previously thought and asserted.
Groundbreaking scheduled:
170. Port-au-Prince
Haiti Temple: Ground being cleared; preparing for groundbreaking ceremony,
which is scheduled for Saturday October
28, 2017; completion anticipated sometime during mid-to-late 2020.
NOTE: Assuming
no delays, the formal construction efforts for this temple will start on Monday
October 30, 2018. If that happens, based on what we now know about this temple,
I feel confident its completion may be marked around the end of May 2020. That
said, I heard from some sources that this temple could be finished much closer
to mid-to-late 2019. I am evaluating all of this and will be sure to provide
any updates to this line of reasoning as I become aware of them. And it obviously
goes without saying that if construction is delayed, that could push the
estimate back to the time-frame indicated above, if not longer.
Scheduled for rededication:
20. Jordan River Utah
Temple: Closed for renovation; rededication scheduled for Sunday May 20, 2018.
Undergoing Renovation (rededication anticipated within the next year or
so):
41. Frankfurt Germany
Temple: Closed for renovation; roof slab poured for basement addition; rededication
anticipated sometime during mid-2018.
NOTE: This temple appears to be on track to be dedicated sometime after
both the rededication of the Jordan River Utah Temple and the dedication of the
Rome Italy Temple. Once more is known about how soon that might be, I will pass
the information along.
Renovations Scheduled (official
closure dates announced):
80. Memphis Tennessee Temple: Scheduled to close
for renovation on September 30, 2017;
rededication may take place sometime during early-to-mid 2019.
NOTE: The Church has a new layout in beta phase for their temples
section. One significant thing coming out of that development has been an
alteration of the previously-set completion dates for temples scheduled for
renovation. Additionally, as previously observed, this temple’s renovation will
change the interior and exterior look of the edifice. With that in mind, an
initial estimate of 18 months for this process seems en pointe. As the process
gets underway, that will likely change. And I will pass along any updates in
that regard as the work proceeds.
18. Tokyo Japan Temple: Scheduled to close for
renovation on October 2, 2017; rededication may take place sometime during early-to-mid
2020.
NOTE: As noted above, this temple’s renovation closure date was pushed
back a few days later than originally announced. Given that this temple will be
renovated to bring electrical and mechanical systems up-to-date, an expansion
is not likely to be in the works. Therefore, it is my feeling that, because of
its comparatively smaller size, it will be the first temple to be rededicated
in 2020.
95. Oklahoma City Oklahoma Temple: Scheduled to
close for renovation on October 14, 2017; rededication may take place sometime
during early-to-mid 2019.
NOTE: The date for this temple’s closure was recently confirmed. I have
also been reminded that this temple has more room for an expansion than the
Memphis Tennessee Temple. That said, it seems unlikely that this will be the
case. It therefore seems likely that a 15-month estimate is perfectly
appropriate for this temple’s renovation. If I find information that changes
this thinking, I will pass it along.
112. Asuncion Paraguay Temple: Scheduled to close
for renovation on October 29, 2017; rededication may take place sometime during
early-to-mid 2019.
NOTE: While this temple’s closure date has been confirmed, what is
still unknown is whether or not the process will involve any expansion. Right
now, it seems unlikely to be so, and, in that regard, a 15-month estimate seems
appropriate for this temple’s potential completion. If I find something in the
near future that changes that reasoning, I will pass it along.
Temples that have a renovation
closure announced, with official dates now known for
all but one of them:
68. Raleigh North Carolina Temple: Scheduled to
close for renovation on January 10, 2018;
rededication may take place sometime during mid-to-late 2019.
NOTE: The date of this temple’s anticipated closure has now been
confirmed by the Church’s new beta site for temples. In addition, as previously
noted, I heard from a member contact in North Carolina that the Saints in that
area were told shortly after this renovation was announced that it would not
involve an expansion. With that in mind, a 15-month estimate seems to be
appropriate for this temple’s renovation process. As more is known about this,
I will pass it along.
94. Baton Rouge Louisiana Temple: Scheduled to
close for renovation on February 1, 2018;
rededication may take place sometime during mid-to-late 2019.
NOTE: This temple’s closure date was also confirmed by the Church’s
beta site for temple information. As of right now, it doesn’t look like plans
are in the works for this temple to be expanded. I am predicting, therefore,
that a 15-month estimate may be wise for this temple’s completion. As more is
known, if my thinking changes, I will pass that along.
13. Oakland California Temple: Scheduled to
close for renovation on February 19, 2018; rededication
may take place sometime during mid-to-late 2019.
NOTE: With the date of this temple’s renovation closure having been
confirmed by the beta site for the Church’s temple information, and knowing
that an 18-month estimate is wise for an initial prediction, primarily because
the stated purpose for this renovation is to upgrade and replace mechanical and
electrical systems.
16. Washington D. C. Temple: Scheduled to close
for renovation on March 4, 2018; rededication
may take place sometime during mid-to-late 2020.
NOTE: Given that this temple’s completion date has been officially
confirmed by the LDS Church’s beta version of their temple section, and given
that the purpose of this temple’s renovation is to upgrade and update
electrical and mechanical systems, the completion estimate above seems likely,
especially in view of the fact that this temple is comparatively larger. I am
venturing an initial estimate that this renovation will take around 20 months.
As with everything else, I will pass along any updates and changes as I become
aware of them.
7. Mesa Arizona Temple: Scheduled to close for
renovation in May 2018 (exact date has not yet been
announced); rededication may take place sometime during mid-to-late 2020.
NOTE: In the 24 hours or so in which the adjustments of all other
renovation dates became necessary as the exact dates were clarified, this
temple remained the one for which a more exact closure date is not yet
confirmed. In the meantime, as previously noted, the stated purpose of this
renovation is to upgrade and update the electrical and mechanical systems of
this temple. Even though this temple is quite a bit larger than the Tokyo Japan
Temple, it has been renovated once previously, and this renovation is therefore
not anticipated to take as long. I will pass along any updates as I become
aware of them.
NOTE ON FUTURE GROUNDBREAKINGS: During
the month of July, I revised the order in which temples in this section were
listed. About a week after doing so, I found out that I needed to revise and
rethink that order again. The current order reflects the latest information I
have (as of the late night hours of July 18). I should also note that the
timing of any temple event is up to the Lord (based on conditions in each
area), so these estimates should not in any way be taken as gospel or official
until they are confirmed or denied by those who have the authorization to do
so.
Announced:
171. Lima Peru Los Olivos
Temple: Planning and preliminary construction phase; awaiting official site
announcement; groundbreaking could take place sometime during early-to-mid 2018.
NOTE: If the information I have
received about this temple and its progress is correct, the year of
preconstruction which the contractor for this temple mentioned was needed prior
to its groundbreaking began in March 2017. While there has been no evidence to
corroborate that this process has indeed begun, it seemed to be enough for me
to move this temple below Haiti’s first. Some have said that the surprise
announcement of the Port-au-Prince groundbreaking may mean we could have other
temples that will have a groundbreaking by the end of this year. But if that
doesn’t happen, I think it is safe to assume and to assert that this temple
will be the first to have a groundbreaking next year, and that it will happen
sooner rather than later.
172. Urdaneta
Philippines Temple: Planning and approval phase; awaiting government
approval and official site announcement; groundbreaking could take place
sometime during early-to-mid 2018.
NOTE: While numerous delays
prevented this temple from making any progress since its announcement almost
seven years ago, those delays are at an end. Since it seems likely that the
Lima Peru Los Olivos Temple will be the next one to have a groundbreaking
(either before the end of this year or during the first part of next year), it
seems logical to assume that this temple could follow shortly thereafter. More
to come once more is known.
173. Harare Zimbabwe Temple:
Planning phase; awaiting official site announcement; groundbreaking could take
place during mid-2018.
NOTE: As previously noted, shortly
after this temple was announced in April 2016, Elder Hamilton made a statement
that indicated a site announcement and groundbreaking would follow for this
temple in short order once 2017 began. Nearly eight months of 2017 have come
and gone with nothing new happening for this temple. For that reason, it seems
safe to assume that it will be the third temple of this announced group to have
a groundbreaking. While some have said it could happen by the end of this year,
it seems more likely that it will not take place until the middle of next year
at earliest. If my thinking in that regard changes, I will pass that along.
174. Saratoga Springs Utah:
Planning phase; awaiting official site announcement; groundbreaking may take
place sometime during mid-2018.
NOTE: When I was encouraged to take
another look at the order in which announced temples could have a subsequent
groundbreaking, I felt impressed to find out, on average, how long it has taken
for temples in Utah County to get from announcement to groundbreaking. Based on
that average, it seems likely that, if a site is announced for it soon, this
temple could have a groundbreaking at the time indicated above, and perhaps
well ahead of the other temples listed below. If my thinking on that changes, I
will pass it along.
175. Brasilia Brazil Temple:
Planning phase; site inspected by Church engineers on June 21, 2017;
groundbreaking may take place sometime during mid-to-late 2018.
NOTE: Even though this temple has
already had a site identified, and that site has been inspected by Church
engineers, over the course of the last several months, I have done considerable
study on when announced temples have gone on to have a groundbreaking. And that
study, combined with valuable feedback from experts on this subject, has led me
to believe that this temple’s groundbreaking is more likely to happen towards
the middle or end of 2018 than the beginning of it, especially because other
temples are almost certain to have a groundbreaking first. I will continue to
pass along any updates to this line of thought and reasoning.
176. Greater Manila
Philippines Temple: Planning phase; site confirmed; awaiting official name
announcement; groundbreaking may take place sometime during mid-to-late 2018.
NOTE: The note on the temple above
applies to this temple as well. Though it has had a site confirmed already,
because other temples are almost certain to have a groundbreaking prior to this
one, it has felt wise to push this estimate back. In the meantime, we could
also hear any day an announcement about the name for this second temple for the
capital city of the Philippines. As more information is released, I will pass
that along.
177. Pocatello Idaho:
Planning phase; awaiting site confirmation; groundbreaking may take place
sometime during late 2018-early 2019.
NOTE: Two potential locations have
been noted as potential locations for this temple site. Until a site
confirmation happens, a groundbreaking time-frame may be hard to pin down.
However, Idaho is well within the “Mormon corridor (of which Arizona and Utah
are also a part), and temples in that area generally get built relatively
easily and quickly. That said, as previously noted, I have felt it wise to push
the estimate for this temple’s groundbreaking back to this point because the
temples above seem more likely to have a groundbreaking prior to this one. That
said, there could be an equal chance that this temple could have a
groundbreaking in either late 2018 or early 2019. I will pass along updates as
I learn of them.
178. Nairobi Kenya Temple:
Planning phase; awaiting official site announcement; media event held June 14,
2017; groundbreaking may take place sometime during early 2019.
NOTE: I was pleased to hear of the
media event held for this temple two months ago. During that event, Elder
Joseph W. Sitati, the first GA Seventy from Kenya, mentioned that it usually
takes a year or two after temple announcements for a groundbreaking to happen.
Given that statement and the fact that the temples listed above this one will
likely have a groundbreaking first, it seemed wise to adjust my estimate. If my
thinking on this changes, I will pass that along.
179. Bangkok Thailand
Temple: Planning phase; awaiting official site announcement; groundbreaking may
take place during mid-2019.
NOTE: As noted previously, some
Thai members and other members familiar with that country have speculated that
an existing Church office building (owned since 2008) will be reconstructed
into an edifice that not only houses Church offices, but the temple and a
meetinghouse as well, similar in concept to the temples in Hong Kong China and
Manhattan New York. If that is confirmed within the next year or so, I could
see a groundbreaking happen at around this time. I will pass along any updates
on this as I receive them.
180. Abidjan Ivory
Coast Temple: Planning phase; awaiting official site announcement;
groundbreaking may take place sometime during mid-to-late 2019.
NOTE: Growth trends in the Ivory
Coast have led some to speculate that a second (and even a third) Ivory Coast
temple could be among the 80 referenced above. Regarding this temple, until
more is known about it, this estimate seems wise.
181. Quito Ecuador
Temple: Planning phase; awaiting official site announcement; groundbreaking may
take place during mid-to-late 2019.
NOTE: Even though Ecuador’s first
temple had a 14-year wait between its site announcement and groundbreaking, the
growth of the Church in South America has been a clear indicator that the
Church won’t have to wait that long for this groundbreaking. Because of the
others listed above that are expected to have a groundbreaking first, it seems
likely that the time-frame above will be likely for this temple’s
groundbreaking. As always, I will adjust this as more becomes known.
182. Belem Brazil Temple:
Planning phase; awaiting official site announcement; groundbreaking may take
place during late 2019-early 2020.
NOTE: While it seems almost certain
that the Brasilia Brazil Temple will have a groundbreaking sooner than this one
(as we still do not know where in Belem this temple will be built), what is not
known is whether this temple will indeed be the last of the current bunch to
have a groundbreaking. As progress is made on temples in the next year or so,
hopefully that will be cleared up. And, as always, I will continue to pass along
updates and changes to this line of thinking.
ADDITIONAL GENERAL NOTE: Temple
announcements within the last three years have come during the April General
Conference. They may happen at any time the First Presidency feels inspired to
make them, but that has been the pattern since 2015. Also, as noted above,
Elder Larry Y. Wilson said in an interview recently that 80 temple sites are under consideration for an
announcement within the next 15 years. So we could be entering another
unprecedented era of temple announcements and construction. That is one big
reason why I have expanded my list of temples that may potentially be
announced. I also know that sites have been procured for future temples in Managua
Nicaragua (which seems most likely, as it is the first of the top ten countries
with the strongest LDS presence that does not yet have a temple, and such a
temple was proposed by Elder Nelson in 2012), Auckland New Zealand, Port
Moresby Papua New Guinea, Bentonville Arkansas, and Missoula Montana (which was
proposed by Elder Bednar sometime in 2014). I have been told by many that an
official announcement will happen once unit growth and activity in temples
within such areas warrants those announcements. If there have been any other
sites purchased elsewhere, they have not yet been made known. We also know that
several potential temples have been proposed in several locations around the
world by many of our prophets and apostles. The Lord will continue to inspire
such temple announcements as they are needed, and all developments will
continue to be included on subsequent versions of this report.
Key:
Bolded numbers and text denote
temples whose numbers already exists (for renovations), or is certain due to a
scheduled dedication, as well as information that is certain, such as
dedication or groundbreaking dates.
Italicized numbers and
text denote temples whose numbers may change based on the order in
which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote
temples whose numbers may change based on progress towards planning, approval,
and groundbreaking.
Red text highlights changes from the last posted temple
progress report.