In order to not disturb the flow of that information, I
will end here as I always do: That does it for now. Any and all comments are,
as always, welcome and appreciated, on any post at any time, as long as such
feedback is in compliance with the established guidelines. Thank you for the
privilege of your time. If you enjoyed what you read here and would like to
stay informed of newly added content, please feel free to subscribe. Until my
next post, I wish each one of you all the best and pray that the Lord will
bless you all in everything you do.
April 1, 2019.
Undergoing
Renovation (rededication scheduled):
80. Memphis Tennessee Temple: Entrance doors installed;
open house reservations available through Saturday April 20, 2019; private
rededication scheduled to occur on Sunday
May 5, 2019.
95. Oklahoma City Oklahoma Temple: Installing entrance
sconces; exterior lighting fully operational; planting shrubs; open house
reservations available through Wednesday May 1, 2019; private rededication
scheduled to occur on Sunday May 19,
2019.
13. Oakland California Temple: Open house reservations
available through Saturday June 1, 2019; rededication scheduled to occur on Sunday June 16, 2019.
41. Frankfurt Germany Temple: Building accessibility ramp;
installing irrigation lines; planting trees and shrubs; rededication scheduled
to occur on Sunday October 20, 2019.
Undergoing Renovation (rededication estimated sometime during 2019):
68. Raleigh North Carolina Temple: Installing decorative
fencing; planting trees and shrubs; pouring walkways; completion estimated
sometime during mid-to-late 2019.
94. Baton Rouge Louisiana Temple: Angel Moroni installed on
February 13, 2019; cladding of exterior walls continues; rededication estimated
sometime during mid-to-late 2019.
Undergoing Renovation (rededication estimated sometime during 2019-2020):
112. Asuncion Paraguay Temple: Interior and exterior work
underway; rededication estimated sometime during late 2019-early 2020.
Undergoing Renovation (rededication estimated sometime during 2020):
18. Tokyo Japan Temple: Interior and exterior renovations
underway; rededication estimated sometime during early-to-mid 2020.
16. Washington D. C. Temple: Exterior wall grout and
stained-glass window repair continues; rededication may take place sometime
during mid-to-late 2020.
8. Mesa Arizona Temple: 104 new trees planted on north lawn; landscaping
elements being installed; replacing sections of roof; rededication may take
place sometime during mid-to-late 2020.
Undergoing Renovation (rededication estimated sometime during 2021):
11. Hamilton New Zealand Temple: Patron accommodation facilities
demolished; preparing ground for replacement facilities; rededication may take
place sometime during early-to-mid 2021.
Renovation scheduled (rededication
estimated sometime during 2022):
48. Hong Kong
China Temple: Scheduled to close for renovation on Monday July 8, 2019; rededication anticipated in mid-to-late 2022.
1. St. George
Utah Temple: Scheduled to close for renovation on Monday November 4, 2019; completion anticipated in mid-to-late 2022.
June 30, 2019.
Undergoing Renovation (rededication scheduled):
68. Raleigh North Carolina Temple: Construction barrier
removed; stained-glass windows installed; driveway asphalt laid; landscaping
nearing completion; rededication scheduled to occur on Sunday October 13, 2019.
41. Frankfurt Germany Temple: Furniture being delivered; laying
sod; rededication scheduled to occur on Sunday
October 20, 2019.
112. Asuncion Paraguay Temple: Interior finish work underway;
rededication scheduled to occur on Sunday
November 3, 2019.
94. Baton Rouge Louisiana Temple: Stained glass windows and
entrance doors installed; landscaping progressing; rededication scheduled to
occur on Sunday November 17, 2019.
Undergoing Renovation (rededication anticipated within the next several
years):
18. Tokyo Japan Temple: Angel Moroni installed atop spire on
April 17, 2019; rededication estimated sometime during mid-2020.
16. Washington D. C. Temple: East parking lot demolition
underway; interior and exterior renovations continue; rededication may take
place sometime during mid-to-late 2020.
7. Mesa Arizona Temple: Pouring retaining wall around temple; setting
forms for west reflecting pool slab; slab poured for north reflecting pool; rededication
may take place sometime during late 2020-early
2021.
11. Hamilton New Zealand Temple: Exterior refurbishment underway; rededication
may take place sometime during mid-2021.
Renovation scheduled:
48. Hong Kong
China Temple: Scheduled to close for renovation on Monday July 8, 2019; rededication estimated in mid-2022.
1. St. George
Utah Temple: Scheduled to close for renovation on Monday November 4, 2019; completion estimated in late 2022-early 2023.
4. Salt Lake
Temple: Scheduled to close for renovation on Sunday December 29, 2019; rededication estimated in early-to-mid 2024.