Temple Construction Progress Update

As the Fort Collins Colorado Temple was dedicated yesterday, and in light of the progress made in temple construction within the last few days, I am posting my updated list of construction milestones. Just wanted to note that we should hear shortly about the opening dates for the Paris France temple. Also, I am considering changing the listed order of temples whose groundbreaking may be announced soon. To me, it seems like Winnipeg may be ahead of the Arequipa Peru temple. Let me know what you think.

Temple Construction Progress Report (current as of 10/17/16)
Current Temple Status: 153 operating; scheduled for dedication; 11 under construction; 3 undergoing renovation; 11 announced (As many as 3 groundbreaking announcements may be made soon).

Dedication scheduled:
154. Star Valley Wyoming Temple: Preparing for dedication; scheduled on Sunday October 30, 2016.
155. Hartford Connecticut Temple: Public open house tours underway through Saturday October 22; dedication scheduled on Sunday November 20, 2016.

Under Construction:
156. Paris France Temple: Interior work underway; open house committee assembled; completion anticipated sometime during the first half of 2017.
157. Meridian Idaho Temple: Adding landscaping structures; installing fence posts and lamp posts; completion anticipated sometime in late 2017.
158. Cedar City Utah Temple: Installing art glass; dropping posts for decorative fencing; completion anticipated sometime in late 2017.
159. Tucson Arizona Temple: Pouring concrete parking lot; interior work underway; completion anticipated sometime in late 2017.
160. Rome Italy Temple: Interior work progressing; completion anticipated sometime in the first half of 2018.
161. Concepcion Chile Temple: Steeple framework going up; completion anticipated sometime in 2018.
162. Kinshasa Democratic Republic of the Congo Temple: Main level floors poured; completion anticipated sometime in 2018.
163. Durban South Africa Temple: Preparing to pour foundation; laying aggregate for parking; street entrance cut; hydroseeding sloped land; completion anticipated sometime in 2018.
164. Barranquilla Colombia Temple: Foundation walls going up; completion anticipated sometime in 2019.
165.  Fortaleza Brazil Temple: Forms and rebar set in anticipation of pouring foundation walls; completion anticipated sometime in 2019.
166. Lisbon Portugal Temple: Site clearing phase; construction fence erected; concrete bleachers removed; completion anticipated sometime in 2019.

Undergoing Renovation:
8. Idaho Falls Idaho Temple: Closed for renovation; finish work underway; resurfacing and restriping parking lot; rededication anticipated sometime during early 2017.
20. Jordan River Utah Temple: Closed for renovation; rededication anticipated sometime in late 2017.
41. Frankfurt Germany Temple: Closed for renovation; rededication anticipated sometime in 2018.



Announced:
167. Arequipa Peru Temple: General contractor selected; construction anticipated to begin late 2016 or early 2017.
168. Winnipeg Manitoba Temple: Permitting phase; temple fireside held September 11, 2016; groundbreaking anticipated in either late 2016 or early 2017.
169. Rio de Janeiro Brazil Temple: Construction preparation phase; plans approved by local government; groundbreaking pending.
170. Urdaneta Philippines Temple: Planning and approval phase; awaiting official site announcement.
171. Port-au-Prince Haiti Temple: Planning and approval phase; awaiting official site announcement.
172. Bangkok Thailand Temple: Planning and approval phase; awaiting official site announcement.
173. Abidjan Ivory Coast Temple: Planning phase; awaiting official site announcement.
174. Quito Ecuador Temple: Planning phase; awaiting official site announcement.
175. Harare Zimbabwe Temple: Planning phase; awaiting official site announcement.
176. Belem Brazil Temple: Planning phase; awaiting official site announcement.
177. Lima Peru Los Olivos Temple: Planning phase; awaiting official site announcement.

Key:
Bolded numbers and text denote temples whose numbers already exists (for renovations), or is certain due to a scheduled dedication, as well as information that is certain, such as dedication or groundbreaking dates.
Italicized numbers and text denote temples whose numbers may change based on the order in which future dedications and groundbreakings are scheduled.
Underlined numbers and text denote temples whose numbers may change based on progress towards planning, approval, and groundbreaking.
Red text denotes changes from the last posted temple progress update.